Electrical Works for HCU unit at IOCL Panipat Refinery Expansion project.
Site
IOCL, Panipat.
Client
M/s. Daelim Industrial Co. Ltd., Korea.
Customer
M/s. Indian Oil Corporation Limited (IOCL).
Project Duration
12 Months.
Our Scope of Work
Installation of Transformer, Switchgear, MCC Panels, Cable Tray, 6.6KV Power Cable, 6.6 KV Bus Duct, 600 V Power Cable, Lighting Fixture, Switch & Receptacle and Fire Fighting.